Friday, 25 November 2011

ABLE Kirklees: The lake liner goes down

Work has begun on the massive task of lining the new fishing lake on the ABLE Kirklees site in Heckmondwike.

Heavy machinery unravels rolls of liner which once in place are sealed and covered with soil recovered from the site works.


Thursday, 13 October 2011

ABLE2Build: Bird Hides

The ABLE2Build production of bird hides made from eco-friendly materials is going from strength to strength. The first model for ABLE Wakefield is now finished and has been installed on site thanks to funding from Biffaward, a multi-million pound fund managed by the Royal Society of Wildlife Trusts (RSWT).  The team are moving on to complete further models for Flamborough and other Yorkshire settings.